Time-Cost Trade-Off problem in project management: A proposed constructive algorithm

No Thumbnail Available

Date

2021-12

Journal Title

Journal ISSN

Volume Title

Publisher

International Islamic University Chittagong

Abstract

Time and cost are two remarkable elements prescriptive of success in project management. The anticipated project length may go over the desired period in many projects. Therefore, it becomes vital to shorten the critical path in order to finish the project by the goal date. Time-cost trade-off (TCT) in project network, the reduction in time with a minimum cost of project activities, has increased efficiency of the project. To shorten a project duration activity crashing, which includes allocating additional resources to an activity with the objective of diminishing its duration, is the most commonly employed compression technique. The objective of an optimum solution of time-cost trade-off is to provide maximum profit opportunity with a minimum time. There are many algorithms (heuristic, meta-heuristic and exact) established in this regard. In this paper a constructive algorithm is proposed and implemented with a fairy application example to acquire optimum solution or close-optimum solution of TCT problems.

Description

IIUC Business Review pp. 115-128

Keywords

Critical path, Time-Cost Trade-off, Crash, Proposed constructive algorithm, Cost-slope.

Citation

DOI: https://doi.org/10.3329/iiucbr.v10i1.62100

Endorsement

Review

Supplemented By

Referenced By