Volume 02, August 2007
Permanent URI for this collectionhttp://dspace.iiuc.ac.bd/handle/123456789/2817
Browse
2 results
Search Results
Item Relationship between Productivity and Profitability: A Case Study of Apex Tannery Ltd.(CRP, International Islamic University Chittagong, 2007-08) Alam, Zahangir; Islam, Serajul; Rahman, Muhammad MahbuburThe study attempts to find out the relationship between productivity and profitability of a firm. It is intended to measure how effectively a firm can uses its assets and how effectively the firm manages its operation. The empirical analysis of the study covered a period of 5 years of the sample enterprise. The study shows that there has been a positive partial relationship between productivity and profitability of the sample enterprise. It also indicates that the performance of the sample enterprise in terms of productivity and profitability has been far from satisfactory during the study period. Also an attempt has been made in this paper to highlight the productivity trends of an industry by using a suitable approach. Finally, the study suggests to undertake every possible measure by the competent authority to improve the position of the productivity and profitability of the sample enterpriseItem Crashing in the Optimal Project Management: Cut Search Method V s. Linear Programming Method(CRP, International Islamic University Chittagong, 2007-08) Khan, Mohammed Shamim Uddin; Rahman, Muhammad MahbuburThe paper compares Cut Search Method and Linear Programming Method to the project time-cost trade- off analysis as a practical application and a conceptual development. Both the solution procedures are presented in this paper to determine the minimum resource utilization requirement to reduce the total project completion time from a normal to a crash condition. The study would help management in selecting the appropriate method for getting optimal crashing decision. The study finds Linear Programming method is better than Cut Search method. Linear Programming approach is also very much suitable to a broad range of practical project management problems, which provide some flexibility. Finally, the study suggests for using Linear Programming Method to the crashing project duration of urgent projects in the pipeline of ADP and private sector projects as well.